Project / 001 · Nexpring Health
BOM-Level Cost Model & Supplier Scorecard
Built an Excel-based sourcing model integrating supplier quotes, should-cost analysis, and performance scorecards to drive optimized supplier selection and EOQ decisions aligned with IBP and demand planning cycles.
$220K annual savings · 15% TCO reduction · 70% lead time cut
Cost ModelingIBPSourcingExcel
Project / 002 · Tufts University
ERP-Based Supply Chain Optimization for MouthGard
Streamlined inventory planning by assessing impacts of 25% demand shifts and 40% lead time changes — safeguarding production continuity and optimizing Total Cost of Ownership across the supply network.
ERP integration · Demand sensitivity analysis · TCO optimization
ERPInventoryTCODemand Planning
Project / 003 · Tufts University
SteriGlove — Automated Sterile Glove System
Designed a manufacturing-feasible NPI product reducing glove waste by 20%, application time by 30%, and infection rates by 25%. Developed full supply chain strategy with distribution model and 24-month payback analysis.
24-month payback · ↓ 30% application time · ↓ 25% infection rate
NPIMedTechSC DesignFinancials
Project / 004 · Tufts University
UniNest — Off-Campus Student Housing Platform
Led product management for UniNest, conducting 25+ student interviews across 7 nationalities to map housing pain points. Developed a high-fidelity Figma prototype iterating through 4+ design cycles based on concept testing and user feedback.
25+ interviews · 7 nationalities · 4+ design iterations
Product MgmtUser ResearchFigmaUX
Project / 005 · Tufts University
Tesla 2035 — Integrated Sustainable Ecosystem Strategy
Co-developed a strategic roadmap for Tesla's transformation by 2035 using SWOT, Pentagon Model (Five Delta), and BEP analysis. Identified pathways across affordable EVs, Supercharger monetization, FSD, energy storage, and the Cybercity vision.
Full SWOT + BEP model · 3-phase roadmap · Pentagon framework
StrategyFinancial ModelingEV / Supply ChainSWOT
Project / 006 · Alfa Laval
Kardex VLM Automated Storage — Business Case
Developed a comprehensive cost-benefit model for deploying a Vertical Lift Module (VLM), projecting measurable gains across cost, throughput, and space — directly informing capital investment decisions.
↓ 30% operational costs · ↑ 50% storage capacity · 40% faster retrieval
WarehouseAutomationCost-BenefitFacility Design
Project / 007 · Industrial Engineering
Automated Material Flow & Smart Factory Design
Engineered automated material flow solutions including ASRS, AGVs, and line-side delivery systems. Used simulation and CAD tools to optimize throughput, buffer sizing, and dynamic manufacturing performance across the production floor.
ASRS + AGV integration · Throughput optimized · Buffer sizing validated
ASRSAGVSimulationCADLean Flow